14 men, 12 hours a day, 5 days, 8 floors up and 171 tons of earth

14 men, 12 hours a day, 5 days, 8 floors up and 171 tons of earth
14 men, 12 hours a day, 5 days, 8 floors up and 171 tons of earth

A block of flats, in south London, required immediate attention when water started leaking from the roof into a tenant’s property.

Unusually the property had a roof garden, and when it rained water-laid in soil would sit above the flats and it started to leak through.

The original plan was to move the plants and soil from one side to the other in order to find the leak. However, this would not stop if it were to happen again therefore the plan was changed to remove the whole garden. This would turn out to be a massive task.

Cherry pickers and scaffolding were required to carry out the works. It took 14 men, 12 hours a day, 5 days, 8 floors up, to remove 171 tons of earth. The soil and vegetation was handled one bucket at a time, passed down a rubbish chute to the ground floor and then loaded on the trucks to be disposed of.

Are you looking for a job?

It looks like you’ve submitted your information in the wrong section of our website. No problem—if you’re looking to apply for a job, you can do so by viewing our current vacancies. Click below to find and apply for roles through the proper channel.

View our current vacancies
inView Highway Technology tower from Clearway
Back to top
Close

What are you looking for?